9th  March 2018                                                                                                            

 Roadworks – B2100 Sparrows Green, Wadhurst


In February, we started resurfacing works on Sparrows Green in Wadhurst. Due to the extreme bad weather we’ve recently had in the county, we have postponed all works. We are aware that since the severe weather last week, the road surface is now in a poor condition as a result.


Tomorrow, Saturday 10 March, we will be carrying out investigations along the road to review the structural stability and to ensure that we design the correct repair solution for the road.


The road will now remain closed to through traffic, and only open for local vehicle access, until we decide on the correct repair method. A diversion will be in place whilst the road is closed.


Please be assured we are working as quickly as possible to fix this and we will keep you updated of the works we are carrying out.


If you do have any queries regarding these works then please do not hesitate to contact us on 0345 60 80 193.


Yours sincerely,


East Sussex Highways

The Broyle



0345 60 80 193


There are no comments yet.

Leave a Reply

Your email address will not be published. Required fields are marked (*).